Build the Electric Cooler
Unlock it at Technology Level 42 and spend 30 Refined Ingot, 30 Circuit Board.
Palworld 1.0 Infrastructure Structure
The Electric Cooler is a Infrastructure structure unlocked at Technology Level 42 and built with 30 Refined Ingot, 30 Circuit Board. It operates with Cooling Lv.1.
Structure Infrastructure
Continue from this structure into base planning or compare workers for the recorded operating requirement.
Handiwork construction labor
Unlock it at Technology Level 42 and spend 30 Refined Ingot, 30 Circuit Board.
A Pal with Cooling Lv.1+ operates this structure after construction.
Craft one of the 0 verified item records associated with this structure.
Construction materials and construction workload describe how the structure is built. Operating work, energy use and SAN change describe how it behaves after construction when those fields are available.
0 of 3 material types ready
Construction Workload
1,000
Handiwork construction labor
Construction workload describes Pal labor needed to finish building the structure. It is not a minimum work suitability level.
Cooling
Minimum work suitability Lv.1
Energy Consumption: 100/sec
Pal SAN Change While Working
-0.15/sec
Negative effect while operating
Recipes are shown only when the source structure data links the item to this structure. Raw schematic rows are normalized before display.
No verified craftable-item records are currently available for this structure.
Recommendations rank Pals by verified Coolinglevel, then use stable Paldex order for ties. No unverified craft-speed value is invented.

#1
BastigorHighest verified Cooling level in the current data.
Add to Base TeamTied workers use stable Paldex order after Cooling level.
Add to Base TeamTied workers use stable Paldex order after Cooling level.
Add to Base TeamTied workers use stable Paldex order after Cooling level.
Add to Base TeamSee where this structure sits among nearby Infrastructure unlocks.
FAQ
Quick answers about materials, Technology Level, work requirements, recipes and recommended workers.
5 questions
Electric Cooler requires 30 Refined Ingot, 30 Circuit Board, 30 Cryogenic Coolant to build.
Electric Cooler is listed at Technology Level 42.
Electric Cooler uses Cooling Lv.1 as its recorded operating requirement.
Use the worker recommendations on this page to compare Pals for the recorded Cooling requirement.
Build workload is construction labor required to finish a structure. Operating work is the Pal work suitability used after the structure is built.
Public snapshot paldb-2026-07-26. Raw source rows are normalized for player-facing pages and are not displayed as generic stats.