Best Pals
Palworld 1.0 data299 Pals · 44,851 combinations · Verified Jul 26, 2026
Data & methodology ->

Palworld 1.0 Infrastructure Structure

Electric Cooler

The Electric Cooler is a Infrastructure structure unlocked at Technology Level 42 and built with 30 Refined Ingot, 30 Circuit Board. It operates with Cooling Lv.1.

InfrastructureTechnology Lv.42Cooling Lv.1

Structure Infrastructure

Continue from this structure into base planning or compare workers for the recorded operating requirement.

Technology
Lv. 42
Build Cost
30 Refined Ingot, 30 Circuit Board
Build Workload
1000

Handiwork construction labor

Operating Work
Cooling Lv.1

How the Electric Cooler Works

1

Build the Electric Cooler

Unlock it at Technology Level 42 and spend 30 Refined Ingot, 30 Circuit Board.

2

Assign a Cooling Pal

A Pal with Cooling Lv.1+ operates this structure after construction.

3

Choose a Recipe

Craft one of the 0 verified item records associated with this structure.

Construction materials and construction workload describe how the structure is built. Operating work, energy use and SAN change describe how it behaves after construction when those fields are available.

Materials Needed for the Electric Cooler

  • x30
  • x30
  • x30

0 of 3 material types ready

Electric Cooler Construction and Work Requirements

Construction Requirements

Technology ProgressionLv.42

Construction Workload

1,000

Handiwork construction labor

Construction workload describes Pal labor needed to finish building the structure. It is not a minimum work suitability level.

Operating Requirements

Cooling

Minimum work suitability Lv.1

Energy Consumption: 100/sec

Pal SAN Change While Working

-0.15/sec

Negative effect while operating

Electric Cooler Recipes and Craftable Items

Recipes are shown only when the source structure data links the item to this structure. Raw schematic rows are normalized before display.

0 items

No verified craftable-item records are currently available for this structure.

Best Pals for the Electric Cooler

Recommendations rank Pals by verified Coolinglevel, then use stable Paldex order for ties. No unverified craft-speed value is invented.

Open Base Team Builder

Cooling Workers

View Cooling Ranking

Electric Cooler Technology Progression

See where this structure sits among nearby Infrastructure unlocks.

FAQ

Electric Cooler FAQ

Quick answers about materials, Technology Level, work requirements, recipes and recommended workers.

5 questions

What materials are needed for the Electric Cooler?

Electric Cooler requires 30 Refined Ingot, 30 Circuit Board, 30 Cryogenic Coolant to build.

What Technology Level unlocks the Electric Cooler?

Electric Cooler is listed at Technology Level 42.

Which work suitability operates the Electric Cooler?

Electric Cooler uses Cooling Lv.1 as its recorded operating requirement.

Which Pals are best for the Electric Cooler?

Use the worker recommendations on this page to compare Pals for the recorded Cooling requirement.

What is the difference between build workload and operating work?

Build workload is construction labor required to finish a structure. Operating work is the Pal work suitability used after the structure is built.

Public snapshot paldb-2026-07-26. Raw source rows are normalized for player-facing pages and are not displayed as generic stats.